You are viewing a single comment's thread.

view the rest of the comments →

0
3

[–] tokui 0 points 3 points (+3|-0) ago 

The sketch is missing a component: there's an adjoining structure with a pool of water to effect the "evaporative" cooling.

0
0

[–] CowWithBeef ago 

I figured this would only work for a few days until the tunnel walls warmed up. The evaporation pool would make a lot of sense.