You can login if you already have an account or register by clicking the button below.
Registering is free and all you need is a username and password. We never ask you for your e-mail.
It wasn’t good work. They needed to add another ground bus bar, but it is a much bigger job than simply adding a circuit. That is why they pigtailed the neutrals. If they were smarter, they would have pigtailed a few grounds and bonded that to the bar. The current normally flows through the neutral so the load on the ground is negligible if anything.
view the rest of the comments →
[–] VanilluhGorilluh 0 points 1 point 1 point (+1|-0) ago
Better check your code for your state, but I've doubled up on a panel for a commercial building before and passed Inspection.
[–] QualityShitposter [S] ago
Trying to sell and the buyers inspector flagged it. I assume it passed inspection at one point, but fussy buyers are fussy buyers.
[–] Pointyball 0 points 1 point 1 point (+1|-0) ago
It wasn’t good work. They needed to add another ground bus bar, but it is a much bigger job than simply adding a circuit. That is why they pigtailed the neutrals. If they were smarter, they would have pigtailed a few grounds and bonded that to the bar. The current normally flows through the neutral so the load on the ground is negligible if anything.