0
0

[–] 19728140? ago 

The last footage I saw showed the southern-facing windows boarded up. In Rusty's drone footage, I see new window stickers on the side windows -- similar to a new home construction before they remove the manufacturer's stickers.

Also, notice they appear to be preparing footings to the side of the patio on the "front" side of the temple. You can see where they've marked the location of the footings with string pulled between stakes in the dugout portion. Maybe was planning to build a bigger "temple", hmmm.

0
0

[–] 19727786? ago 

I think they have done a bunch of construction on that thing. I remember the windows being different on some old pics from 8chan. If you look inside, it looks like the interior has been gutted and is being remodeled...there is scaffolding in there. I think something is being covered up. Recent drone photos do not match the older ones from early this year and last year.

0
2

[–] 19727458? 0 points 2 points (+2|-0) ago 

All the action is below ground level.

0
0

[–] 19727457? ago 

So what’s the big deal?

0
0

[–] 19727456? ago 

Just watched..you are right! I find the lines on the ground interesting...I wonder if the crevices indicate an elevator for vehicles....drive goes all the way to the temple but no parking lot. If "they" are doing all that has been speculated....might want their cars hidden. (drones ya know :D)

0
0

[–] 19727358? ago 

Thanks for the drone footage Dale Gribble!