0
0

[–] principle [S] ago 

In other words, the contractor would not be liable if the ship fails the test after the delivery.

0
1

[–] thelma 0 points 1 point (+1|-0) ago 

Future news:

The Navy's decision not to do shock trials back in 2018 proved to be a big mistake as the hull of the newest and most expensive carrier ever built would have been discovered to have had a small flaw that made it vulnerable to underwater shocks. The fix likely would have cost ten dollars but was not discovered until after it was sunk.

0
0

[–] Jimmycog ago 

Can you say POS.